I-635 East (LBJ East) Reconstruction
Reconstruction of I-635 between US 75 and I-30, including bridge replacements and interchange reconfiguration.
A working catalog of active and planned highway, rail, bridge, transit, and public-works projects across Dallas, Fort Worth, Arlington, and the broader North Texas region.
Reconstruction of I-635 between US 75 and I-30, including bridge replacements and interchange reconfiguration.
26-mile commuter-rail corridor connecting DFW Airport to Plano via Carrollton, Addison, and Richardson.
Second downtown alignment to relieve the Bryan/Pacific surface bottleneck and raise system capacity.
Five-acre park capping the I-35E / US 67 trench, reconnecting Oak Cliff neighborhoods.
Feasibility study extending TEXRail south to the Near Southside Medical District.
Managed-lane operations on SH 183, IH 820, and US 81/287 with active traffic management.
Ongoing modernization and rehabilitation of Trinity River crossings within the Dallas Floodway.
Capacity additions and managed-lane extension serving the Alliance industrial corridor.
Platform extensions to support three-car light-rail trainsets across legacy alignments.
On-demand microtransit and event-day shuttle operations around AT&T Stadium and Globe Life Field.
Long-range planning for east-west reconstruction of I-30 through the Dallas central business district.
Shared-use path completing trail connections parallel to the Silver Line corridor.